Now serving Ahmedabad and Gandhinagar

See local coverage

Now serving Ahmedabad and Gandhinagar

Property inspection for decisions that deserve more than a quick walkthrough

BuildInspect documents inspection findings, evidence and practical next steps for new homes, existing-property concerns, societies and planned construction questions.

Good preparation makes the inspection more useful

Builder handover

Access permissions, finished-surface readiness, available utilities and the builder's inspection window shape useful coverage.

Rain-linked symptoms

For intermittent dampness or leakage, dated photographs, recent weather, repair history and access to adjacent areas can matter as much as the visit.

Thermal imaging included

Pre-possession flat and leakage inspections use paired thermal and visible images to map moisture-related temperature patterns and possible water pathways.

Shared property

Basements, terraces and common services need society permissions, area ownership and a sampling plan before observations can support action.

Select a protocol around the property question

Availability varies by property type: Ahmedabad and Gandhinagar residential work is active; broader Gujarat work is confirmed case by case.

For new flats before handover

Pre-possession flat inspection

A systematic inspection of accessible rooms, finishes, fixtures and agreed functional checks before you accept possession of a new flat, with room-by-room thermal imaging included in the base scope and base quote. See method and deliverables

A practical availability and completeness check

RERA & Property Document Check

A non-legal, inventory-based check of whether agreed builder-supplied RERA, NOC, project, handover and property documents are available and complete enough to identify. It does not verify authenticity, compliance, ownership, title or encumbrances. See method and deliverables

By a BuildInspect-affiliated advocate

Legal Document Verification

A separately defined legal review of the property documents and questions accepted by the affiliated advocate, which may include title-chain, search and transaction-document review where applicable to the engagement. See method and deliverables

Five details make the first conversation useful

  1. 01

    Locality and property type
    Flat, villa, society/common area, active construction site, commercial or industrial property.

  2. 02

    Approximate size and layout
    Configuration, levels, terraces, basements or separately accessed areas.

  3. 03

    Current stage
    Builder handover, occupied property, recurring symptom, construction milestone or facility question.

  4. 04

    Access and utilities
    Permissions, water, power, safe access and any time restrictions.

  5. 05

    Decision and timing
    What you need to understand, document or verify—and by when.

Inspect, document, rectify, verify

01

Confirm the inspection

Agree the question, inspection areas, methods and visit preparation.

02

Record evidence

Link observations and useful evidence to a location, with completed checks and follow-up needs clearly recorded.

03

Assign action

Discuss the report with the responsible party and agree practical next steps.

04

Verify separately

Use completion evidence or a separate reinspection where independent closure matters.

Start with a page-aware WhatsApp message

Add the property type, locality, approximate size and timeline. If WhatsApp is inconvenient, request a callback for review within one business day.